top of page
WhatsApp Image 2022-02-10 at 14.16.13.jpeg

OUR SERVICES  >  CAPABILITIES

Civil Structure 
Maintenance

With an established track record since 1997, Envirotec Controls is known for its innovative process to ensure quality, consistency, and safety for our valued clients and staff.

CIVIL MAINTENANCE

Ongoing Projects

Project Name: Tanjong Pagar Railway Station
Tanjong Pagar Railway Station.jpeg

Client: Land Transport Authority/Shanghai Chong Kee

Location: Tanjong Pagar Railway Station

Year: Ongoing

The project was awarded by Shanghai Chong Kee for the Land Transport Authority.
The main scope of work includes:​

  • Concrete Repair Works

  • Waterproofing Works on Roof

Project Name: NSEWL Tunnel Spalling Concrete Repair Work 
WhatsApp Image 2021-12-01 at 04.09.37.jpeg

Client: SMRT Corporation Ltd

Location: North-South Line and East-West Line

Year: Ongoing

The project was awarded by SMRT and the main scope of work includes:

  • Spalling Concrete Removal

  • Concrete Repair Works

during non-traffic hours (between 1 - 3 am) in North-South Line, Singapore’s first MRT line, and the East-West Line, Singapore's longest train line that is in operation.

Project Name: Pressure Grouting Work 
WhatsApp Image 2021-09-03 at 17.40.13 (1).jpeg

Client: SBS Transit Downtown Line Pte Ltd

Location: Downtown Line

Year: 2018 - Ongoing

The project was awarded by SBS Transit and the main scope of work includes:

  • Pressure Grouting 

  • Patching Works 

​during non-traffic hours (between 1 - 3 am) in Downtown Line, Singapore's longest underground and driverless MRT line.

bottom of page